For an Austrian SME, I comprehensively analyzed the existing IT infrastructure and developed a strategy for retiring the traditional on-premises environment. The starting point was an infrastructure that had grown organically, based on SBS2011, locally operated server services, local web hosting, and remote access to business applications. The existing environment caused high maintenance overhead, required regular manual intervention, and offered only limited flexibility for mobile work.
Analysis & Scenarios
This was not just about the technical migration. In the first step, the existing infrastructure, requirements, risks and future costs were analyzed, and various modernization scenarios were developed from this. A renewal of the existing on-premises infrastructure, a hybrid operating model, and an extensive cloud solution based on Microsoft 365 and Azure were compared.
Economics & Decision Basis
In addition to technical criteria such as security, availability, scalability and maintainability, the economic impact of the different variants was also examined. This included investment costs, ongoing operating costs, maintenance effort and long-term total cost of ownership. A cost and break-even analysis then served as the basis for management's decision. The analysis showed that, for the scenario under consideration, the cloud variant resulted in lower and more predictable total costs while also reducing maintenance effort.
The results were compiled and presented in a structured decision paper – from the as-is analysis through requirements and solution options to economics and the implementation plan.
Implementation
Based on this decision, the future cloud architecture was planned and the technical migration was implemented. This included, among other things:
- Migration of the local Exchange server to Exchange Online
- Centralized user and identity management via Microsoft Entra ID
- Introduction of multi-factor authentication
- Migration of company data to SharePoint Online and OneDrive
- Introduction of Microsoft Teams for collaboration
- Centralized device management via Microsoft Intune
- Implementation of security policies such as BitLocker, automated updates and device configurations
- Deployment of Microsoft Defender for Business
- Migration of the company website from the local web server to Azure App Service
- Securing and delivering the website via Azure Front Door
- Design of possible Power Automate workflows, for example for automated processing and archiving of incoming invoices
- Planning the controlled decommissioning of the previous local server infrastructure
Outcome
The result is a modernized, cloud-based work environment that enables location- and device-independent work, is centrally managed, and stays automatically up to date – with predictable costs and significantly less administrative effort.
The goal was not simply to move "to the cloud", but to create an economically sound, secure and long-term maintainable IT architecture with predictable costs and significantly less administrative effort.
← Back to overviewThe presentation of the concept was carefully prepared, structured and to the point. Mr. Kral works precisely, punctually and is absolutely reliable – with an extremely fast response time and solution-oriented explanations.